CECO VISION Vision Light Steel Door with Glass: Square Window
The CECO VISION Vision Light Steel Door with Glass: Square Window is a steel security door with a 90-minute fire rating and an 80-inch door opening height. It features a cylindrical lock type and a non-handed…
SKU 3G-OTH-645002
Also listed as: CHMDXVL3068XCYLCE18gaWG · CHMD X VL30 68 X CYL CE 18ga WG · CHMD-X-VL30-68-X-CYL-CE-18ga-WG
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
The CECO VISION Vision Light Steel Door with Glass: Square Window is a steel security door with a 90-minute fire rating and an 80-inch door opening height. It features a cylindrical lock type and a non-handed orientation, with the manufacturer part number CHMD X VL30 68 X CYL-CE-18ga-WG.
Frequently Asked Questions
What is the CECO VISION Vision Light Steel Door with Glass used for?
This steel security door with a square glass window is designed for commercial and industrial applications requiring a 90-minute fire rating. It provides secure access control with a cylindrical lock and non-handed orientation, suitable for high-traffic areas.
What are the specifications of the CECO VISION Vision Light Steel Door?
The door is made of steel with a 90-minute fire rating, an 80-inch door opening height, and a cylindrical lock type. It is non-handed, meaning it can be installed for left or right swing. The manufacturer part number is CHMD X VL30 68 X CYL-CE-18ga-WG.
Where to buy the CECO VISION Vision Light Steel Door worldwide?
3G Electric supplies and delivers the CECO VISION Vision Light Steel Door worldwide. As a global industrial solutions provider, we handle full logistics and customs clearance to ensure your order arrives at your facility, wherever it is located.
How to install a CECO VISION Vision Light Steel Door?
Installation should follow standard steel door procedures: ensure the frame is plumb and level, attach hinges securely, and adjust the cylindrical lock for proper alignment. Always consult the manufacturer's manual for specific torque and clearance requirements to maintain the 90-minute fire rating.
CECO VISION Products
3G Electric supplies CECO VISION security doors. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
