FBR GAS P 130/M CE-EL TC EVO
The FBR GAS P 130/M CE-EL TC EVO is a gas burner rated to 1540 kW maximum output, designed for 2 stages sliding or modulating operation. Engineered for industrial heating applications across Singapore and Southeast…
SKU 3G-OTH-806866
Also listed as: GASP130MCEELTCEVO · GAS P 130 M CE EL TC EVO · GAS-P-130-M-CE-EL-TC-EVO
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
The FBR GAS P 130/M CE-EL TC EVO is a gas burner rated to 1540 kW maximum output, designed for 2 stages sliding or modulating operation. Engineered for industrial heating applications across Singapore and Southeast Asia, this unit is supplied by 3G Electric with full DDP logistics support and technical backing since 1990.
Frequently Asked Questions
What is the FBR GAS P 130/M CE-EL TC EVO gas burner used for?
The FBR GAS P 130/M CE-EL TC EVO is a gas burner used for industrial heating applications, such as boilers, furnaces, and process heaters. It is rated to 1540 kW maximum output and supports 2 stages sliding or modulating operation, making it suitable for precise thermal control in Singapore and Southeast Asia.
What are the specifications of the FBR GAS P 130/M CE-EL TC EVO?
The FBR GAS P 130/M CE-EL TC EVO is a gas burner with a maximum power output of 1540 kW. It operates on gas fuel and features 2 stages sliding or modulating control. This industrial burner is designed for reliable performance in demanding heating systems.
Where to buy the FBR GAS P 130/M CE-EL TC EVO in Singapore?
You can source the FBR GAS P 130/M CE-EL TC EVO gas burner from 3G Electric in Singapore. Since 1990, we have supplied industrial equipment with full DDP logistics, handling customs clearance and delivery to your site. Contact us for availability and lead time.
How to install the FBR GAS P 130/M CE-EL TC EVO gas burner?
Installation of the FBR GAS P 130/M CE-EL TC EVO should follow the manufacturer's manual and local gas safety codes. Ensure proper gas supply pressure, electrical connections for modulating control, and flue gas venting. Always use a certified technician for commissioning to guarantee safe and efficient operation.
Used in
Common applications for FBRFBR Products
3G Electric supplies FBR burners & combustion. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
