FBR GAS P 250/M CE-EL TL
The FBR GAS P 250/M CE-EL TL is a gas burner rated for maximum 2907 kW, designed for 2 stages sliding or modulating operation. As an authorised distributor, 3G Electric supplies this unit with full DDP logistics to…
SKU 3G-OTH-806846
Also listed as: GASP250MCEELTL · GAS P 250 M CE EL TL · GAS-P-250-M-CE-EL-TL
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
The FBR GAS P 250/M CE-EL TL is a gas burner rated for maximum 2907 kW, designed for 2 stages sliding or modulating operation. As an authorised distributor, 3G Electric supplies this unit with full DDP logistics to Singapore and Southeast Asia, ensuring seamless integration into your industrial heating infrastructure.
Frequently Asked Questions
What is the FBR GAS P 250/M CE-EL TL gas burner used for?
The FBR GAS P 250/M CE-EL TL is a heavy-duty gas burner for industrial heating systems such as boilers, furnaces, and air heaters. It supports 2-stage sliding or modulating operation up to 2907 kW, making it suitable for process heating in Singapore’s manufacturing and energy sectors.
What are the specifications of the FBR GAS P 250/M CE-EL TL?
The FBR GAS P 250/M CE-EL TL is a gas burner with a maximum power of 2907 kW. It operates in 2 stages sliding or modulating mode for precise heat output control. The burner is designed for natural gas or LPG and is built for reliable industrial combustion applications.
Where to buy the FBR GAS P 250/M CE-EL TL in Singapore?
3G Electric, an authorised FBR distributor since 1990, supplies the GAS P 250/M CE-EL TL to Singapore. We handle full DDP logistics, customs clearance, and local delivery, ensuring the burner reaches your facility ready for installation. Contact our team for pricing and lead time.
How to install the FBR GAS P 250/M CE-EL TL gas burner?
Installation must follow the FBR manual and local gas safety codes. Ensure the burner flange matches the boiler opening, connect gas supply with proper pressure regulation, and wire the control panel for 2-stage or modulating operation. Always commission with a combustion analyser to verify air-fuel ratio.
Used in
Common applications for FBRFBR Products
3G Electric supplies FBR burners & combustion. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
