FIELD CONTROLS Combustion Air Intake System: 900 cfm Max, 8 in / 8 in Inlet/Outlet, Up to 910,000 BtuH
The FIELD CONTROLS Combustion Air Intake System (SKU CAS-6, MPN CAS-6) is a combustion air intake system with a maximum capacity of 900 cfm and up to 910,000 BtuH, featuring 8 in inlet and outlet connections. It…
SKU 3G-OTH-74095
Also listed as: CAS6 · CAS 6
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
The FIELD CONTROLS Combustion Air Intake System (SKU CAS-6, MPN CAS-6) is a combustion air intake system with a maximum capacity of 900 cfm and up to 910,000 BtuH, featuring 8 in inlet and outlet connections. It includes a relay and operates on a nameplate voltage of 120V AC.
Frequently Asked Questions
What is the FIELD CONTROLS CAS-6 combustion air intake system used for?
The FIELD CONTROLS CAS-6 supplies combustion air to gas-fired heating equipment, ensuring proper burner operation and safety. It is used in commercial and industrial applications where reliable air intake is critical for combustion efficiency and system performance.
What are the specifications of the FIELD CONTROLS CAS-6?
The CAS-6 has a maximum capacity of 900 cfm and up to 910,000 BtuH, with 8 in inlet and 8 in outlet connections. It includes a relay and operates on 120V AC nameplate voltage. The manufacturer part number is CAS-6.
Where to buy the FIELD CONTROLS CAS-6 worldwide?
3G Electric supplies the FIELD CONTROLS CAS-6 combustion air intake system to customers worldwide. We handle full logistics, customs clearance, and delivery to your site. Contact us for a quote and lead time on this item.
How to install the FIELD CONTROLS CAS-6 combustion air intake system?
Install the CAS-6 per local codes and the manufacturer's instructions. Ensure the intake is free of obstructions and properly sized for the equipment's BtuH rating. Connect the 8 in inlet and outlet, wire the 120V AC relay, and verify airflow before startup.
Used in
Common applications for FIELD CONTROLSFIELD CONTROLS Products
3G Electric supplies FIELD CONTROLS combustion air intake systems. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
