FBR metano | Option: DX90¡
FBR gas burner for industrial heating applications with progressive and modulating control. Delivers 485–4070 kW output with DN100 connection and 535 mm nozzle, ideal for large-scale combustion systems requiring…
SKU 3G-FBR-00132
Also listed as: 0561785 · 056178 5 · 056178-5
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
FBR gas burner for industrial heating applications with progressive and modulating control. Delivers 485–4070 kW output with DN100 connection and 535 mm nozzle, ideal for large-scale combustion systems requiring precise flame modulation.
Frequently Asked Questions
What is the FBR GAS/M CE DN100-FS100 gas burner used for?
The FBR GAS/M CE DN100-FS100 gas burner is used for industrial heating applications requiring precise flame modulation. It delivers 485–4070 kW output and is ideal for large-scale combustion systems such as boilers, furnaces, and process heaters in manufacturing and power generation.
What are the specifications of the FBR GAS/M CE DN100-FS100 gas burner?
This FBR burner features progressive and modulating control, runs on gas, and has a 535 mm nozzle. It delivers 485–4070 kW power output with a DN100 connection and requires a 3-phase electrical supply. It meets CE 676 class 3 low-emission standards (NOx < 80 mg/kWh).
Where to buy the FBR GAS/M CE DN100-FS100 gas burner in Singapore?
You can source the FBR GAS/M CE DN100-FS100 gas burner through 3G Electric in Singapore. We handle logistics, customs clearance, and delivery to your site. Contact us for pricing and lead time on this industrial burner.
How to install the FBR GAS/M CE DN100-FS100 gas burner?
Installation must follow the burner manual and local gas safety codes. Ensure the DN100 flange aligns correctly with the boiler or furnace opening, and the 535 mm nozzle is properly inserted. Connect the 3-phase electrical supply and commission the progressive/modulating control system per FBR guidelines.
Used in
Common applications for FBRFBR Products
3G Electric supplies FBR burners & combustion. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
