FBR variant_2
FBR GAS P 100/2 CE TC EVO is a two-stage gas burner for industrial heating applications, delivering thermal power from 172 to 1000 mcal/h with a 250 mm nozzle. It operates at IP 40 protection and 81-82 dBA noise…
SKU 3G-FBR-00404
Also listed as: 00236741 · 002367 41 · 002367-41
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
FBR GAS P 100/2 CE TC EVO is a two-stage gas burner for industrial heating applications, delivering thermal power from 172 to 1000 mcal/h with a 250 mm nozzle. It operates at IP 40 protection and 81-82 dBA noise levels, suitable for medium to large-scale combustion systems.
Frequently Asked Questions
What is the FBR GAS P 100/2 CE TC EVO gas burner used for?
The FBR GAS P 100/2 CE TC EVO is a two-stage gas burner designed for medium to large-scale industrial heating applications. It delivers thermal power from 172 to 1000 Mcal/h and is suitable for boilers, furnaces, and other combustion systems in Singapore's manufacturing and process industries.
What are the specifications of the FBR GAS P 100/2 CE TC EVO?
The FBR GAS P 100/2 CE TC EVO has a thermal power range of 172–1000 Mcal/h (200–1163 kW), a 250 mm nozzle, IP 40 protection, and noise level of 81–82 dBA. It operates on 3~400V or 1/N~230V-50Hz power supply, with a fan motor of 1.5 kW and weight of 44 kg.
Where to buy the FBR GAS P 100/2 CE TC EVO in Singapore?
3G Electric supplies the FBR GAS P 100/2 CE TC EVO gas burner to Singapore. We handle sourcing, logistics, customs clearance, and delivery to your facility. Contact our team for pricing and lead time on this two-stage burner for industrial heating systems.
How to install and maintain the FBR GAS P 100/2 CE TC EVO?
Install the FBR GAS P 100/2 CE TC EVO using the supplied flange and gasket, ensuring proper gas train connection and electrical supply per the datasheet. Regular maintenance includes checking the combustion head adjustment, cleaning the air blower, and verifying gas pressure switch settings for safe two-stage operation.
Used in
Common applications for FBRFBR Products
3G Electric supplies FBR burners & combustion. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.









