FBR variant_2
FBR GAS P 130/M is a two-stage modulating gas burner for industrial heating applications, delivering 172–1000 mcal/h thermal power with low NOx fuel type and IP 54 protection. The unit operates at 81–82 dBA and fits…
SKU 3G-FBR-00443
Also listed as: 00246831 · 002468 31 · 002468-31
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
FBR GAS P 130/M is a two-stage modulating gas burner for industrial heating applications, delivering 172–1000 mcal/h thermal power with low NOx fuel type and IP 54 protection. The unit operates at 81–82 dBA and fits retrofit and new-build industrial combustion systems.
Frequently Asked Questions
What is the FBR GAS P 130/M CE-LX4 TL EVO Cl. 4 gas burner used for?
The FBR GAS P 130/M is a two-stage modulating gas burner designed for industrial heating applications such as boilers, furnaces, and thermal fluid heaters. It delivers 172–1000 mcal/h thermal power with low NOx emissions (Class 4) and is suitable for both retrofit and new-build combustion systems.
What are the specifications of the FBR GAS P 130/M CE-LX4 TL EVO Cl. 4?
This FBR burner operates at 2 stages sliding or modulating, with a power range of 280–1450 kW, IP 54 protection, and noise level of 81–82 dBA. It requires a 3~400V, 1/N~230V-50Hz electrical supply, draws 3.6 A, and weighs 52 kg. The gas consumption is 20.1/58.3–116.7 m³/h.
Where to buy the FBR GAS P 130/M CE-LX4 TL EVO Cl. 4 in Singapore?
3G Electric sources and delivers the FBR GAS P 130/M CE-LX4 TL EVO Cl. 4 to Singapore. We handle logistics, customs clearance, and local technical support for industrial combustion projects. Contact our team for a quotation and lead time on this low NOx gas burner.
How to install and maintain the FBR GAS P 130/M CE-LX4 TL EVO Cl. 4?
Installation requires a certified technician to connect the gas train, electrical supply (3~400V), and combustion head to the generator flange. Maintenance includes periodic cleaning of the air shutter, gas filter, and checking the valve proving system. Always follow the FBR manual for safe operation and calibration.
Used in
Common applications for FBRFBR Products
3G Electric supplies FBR burners & combustion. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.







