FBR variant_2
The FBR GAS P 300/M CE TL MEC is a two-stage gas burner for industrial heating applications, delivering 1000–6500 Mcal/h thermal power with modulating or sliding flame control. Operating at 500 mbar gas pressure with…
SKU 3G-FBR-00577
Also listed as: 0028702 · 002870 2 · 002870-2
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
The FBR GAS P 300/M CE TL MEC is a two-stage gas burner for industrial heating applications, delivering 1000–6500 Mcal/h thermal power with modulating or sliding flame control. Operating at 500 mbar gas pressure with a 22 W fan motor, it fits medium to large-scale process heating systems requiring flexible load management.
Frequently Asked Questions
What is the FBR GAS P 300/M CE TL MEC used for?
The FBR GAS P 300/M CE TL MEC is a two-stage progressive or modulating gas burner for industrial heating systems. It is designed for medium to large-scale process heating applications requiring flexible load management, such as boilers, furnaces, and thermal fluid heaters.
What are the specifications of the FBR GAS P 300/M CE TL MEC?
The FBR GAS P 300/M CE TL MEC delivers 1000–6500 Mcal/h thermal power (465–3488 kW) with a 22 W fan motor. It operates at 500 mbar maximum gas pressure, has IP54/IP40 protection, and weighs 315 kg. The burner supports natural gas or LPG and includes a fully assembled gas train.
Where to buy the FBR GAS P 300/M CE TL MEC in Singapore?
You can source the FBR GAS P 300/M CE TL MEC through 3G Electric in Singapore. We handle logistics, customs clearance, and delivery to your site. Contact us for availability and lead time on this industrial gas burner.
How to install the FBR GAS P 300/M CE TL MEC burner?
Installation of the FBR GAS P 300/M CE TL MEC should follow the manufacturer's manual. Ensure the burner flange and gasket are properly mounted on the generator. The gas train is pre-assembled and tested; connect to the gas supply at the specified pressure (max 500 mbar) and electrical supply (3~400V, 50 Hz).
Used in
Common applications for FBRFBR Products
3G Electric supplies FBR burners & combustion. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.














