FBR variant_2
FBR GAS X5/M is a two-stage gas burner for industrial heating applications, delivering 68–400 kW thermal power with low-NOx emissions certification. Features 200 W fan motor, IP protection, and 66–68 dBA noise level…
SKU 3G-FBR-00377
Also listed as: 00229241 · 002292 41 · 002292-41
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
FBR GAS X5/M is a two-stage gas burner for industrial heating applications, delivering 68–400 kW thermal power with low-NOx emissions certification. Features 200 W fan motor, IP protection, and 66–68 dBA noise level, operating on 1/N~230V-50Hz electrical supply for precise modulating control.
Frequently Asked Questions
What is the FBR GAS X5/M CE-LX4 TL EL CL.4 gas burner used for?
The FBR GAS X5/M CE-LX4 TL EL CL.4 is a two-stage gas burner for industrial heating applications such as boilers, furnaces, and air heaters. It delivers 68–400 kW thermal power with low-NOx emissions (CE 676 class 4, NOx ≤ 60 mg/kWh) and supports natural gas or LPG.
What are the specifications of the FBR GAS X5/M CE-LX4 TL EL CL.4?
The FBR GAS X5/M CE-LX4 TL EL CL.4 has a thermal power range of 68–400 kW, a 200 W fan motor, IP protection, 66–68 dBA noise level, and operates on 1/N~230V-50Hz electrical supply. It features a Lamtec BT3 control box with LCD display and two servomotors for air/gas adjustment.
Where to buy the FBR GAS X5/M CE-LX4 TL EL CL.4 in Singapore?
You can source the FBR GAS X5/M CE-LX4 TL EL CL.4 through 3G Electric in Singapore. We handle logistics, customs clearance, and delivery to your site. Contact our team for pricing and lead time on this FBR gas burner.
How to install the FBR GAS X5/M CE-LX4 TL EL CL.4 gas burner?
Installation requires mounting the burner flange to the boiler using the supplied gasket, connecting the gas train (including class A valve, filter, and pressure switch), and wiring the 230V-50Hz supply. Commissioning involves setting the air/gas curves via the Lamtec BT3 LCD display. Always follow the FBR manual and local gas safety codes.
Used in
Common applications for FBRFBR Products
3G Electric supplies FBR burners & combustion. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.














