HARRINGTON Bottom Hook Assembly: Electric Chain Hoists, 6,000 lb Compatible Load Capacity
The HARRINGTON Bottom Hook Assembly (MPN ER1FS2011) is a replacement bottom hook designed for HARRINGTON SNER series electric chain hoists. This assembly includes a safety latch and is compatible with hoists having a…
SKU 3G-OTH-330865
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
The HARRINGTON Bottom Hook Assembly (MPN ER1FS2011) is a replacement bottom hook designed for HARRINGTON SNER series electric chain hoists. This assembly includes a safety latch and is compatible with hoists having a 6,000 lb load capacity.
Frequently Asked Questions
What is the HARRINGTON Bottom Hook Assembly used for?
The HARRINGTON Bottom Hook Assembly (MPN ER1FS2011) is a replacement component for SNER series electric chain hoists. It supports a 6,000 lb load capacity and includes a safety latch. This assembly is used in industrial lifting applications to securely attach loads to the hoist's load chain.
What are the specifications of the HARRINGTON Bottom Hook Assembly?
The HARRINGTON Bottom Hook Assembly (MPN ER1FS2011) is designed for SNER series electric chain hoists with a 6,000 lb compatible load capacity. It includes a safety latch and is a bottom hook type assembly. The product is manufactured by HARRINGTON and is a direct replacement part for their hoists.
Where to buy the HARRINGTON Bottom Hook Assembly worldwide?
3G Electric supplies the HARRINGTON Bottom Hook Assembly (MPN ER1FS2011) worldwide. As a global industrial equipment distributor, we handle full logistics, customs clearance, and delivery to your location. Contact us to source this HARRINGTON replacement part for your SNER series hoist.
How to install the HARRINGTON Bottom Hook Assembly?
To install the HARRINGTON Bottom Hook Assembly (MPN ER1FS2011), first ensure the hoist is de-energized and the load chain is slack. Remove the existing hook assembly, then attach the new assembly by securing the load chain to the hook's mounting point. Always follow the manufacturer's manual and use proper lockout/tagout procedures.
Used in
Common applications for HARRINGTONHARRINGTON Products
3G Electric supplies HARRINGTON bottom hooks for hoists. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
