LABCONCO Spill Stop Work Surface: 36 in Overall Wd, 8 ft Overall Lg, 1 1/4 in Thick
The LABCONCO Spill Stop Work Surface is a 36-inch wide, 8-foot long, 1 1/4-inch thick epoxy fume hood work surface (MPN 9503810) designed for use with the Protector XStream Laboratory Hood. It includes a left-rear…
SKU 3G-OTH-364083
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
The LABCONCO Spill Stop Work Surface is a 36-inch wide, 8-foot long, 1 1/4-inch thick epoxy fume hood work surface (MPN 9503810) designed for use with the Protector XStream Laboratory Hood. It includes a left-rear cup sink cut-out and features a large radius to aerodynamically direct airflow into the fume hood.
Frequently Asked Questions
What is the LABCONCO Spill Stop Work Surface used for?
The LABCONCO Spill Stop Work Surface is a fume hood work surface designed for use with the Protector XStream Laboratory Hood. Its epoxy construction resists chemical spills, and the large radius aerodynamically directs airflow into the hood, improving containment and lab safety.
What are the specifications of the LABCONCO 9503810 work surface?
The LABCONCO 9503810 is a 36 in wide, 8 ft long, 1 1/4 in thick epoxy fume hood work surface. It includes a left-rear cup sink cut-out and features a large radius to aerodynamically direct airflow into the fume hood. It is designed for the Protector XStream Laboratory Hood.
Where to buy LABCONCO fume hood work surfaces worldwide?
3G Electric supplies the LABCONCO Spill Stop Work Surface (MPN 9503810) to customers worldwide. As a global industrial solutions provider, we handle full logistics, customs clearance, and delivery to your facility. Contact us for a quote and lead time.
How to install the LABCONCO Spill Stop Work Surface?
Installation of the LABCONCO Spill Stop Work Surface should follow the Protector XStream Laboratory Hood manual. Ensure the epoxy surface is level and properly seated in the hood frame. The left-rear cup sink cut-out must align with the hood's plumbing connections for proper drainage.
Used in
Common applications for LABCONCOLABCONCO Products
3G Electric supplies LABCONCO fume hood work surfaces. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
