STIRLING ULTRACOLD Phase Change Material Kit, SUPCM-70-Kit
The STIRLING ULTRACOLD Phase Change Material Kit (MPN SUPCM-70-Kit) includes three ABS Plastic bricks, each 15 inches in overall length and 9 inches in overall width. This kit is compatible with the STIRLING…
SKU 3G-OTH-369030
Also listed as: SUPCM70Kit · SUPCM 70 Kit
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
The STIRLING ULTRACOLD Phase Change Material Kit (MPN SUPCM-70-Kit) includes three ABS Plastic bricks, each 15 inches in overall length and 9 inches in overall width. This kit is compatible with the STIRLING ULTRACOLD ULT25NEU model. It is categorized under Cold Storage Alarms, Power Cords & Accessories.
Frequently Asked Questions
What is the STIRLING ULTRACOLD Phase Change Material Kit used for?
This kit provides thermal stability for cold storage applications. The three ABS plastic bricks absorb and release heat to maintain consistent temperatures, protecting sensitive contents during power fluctuations or door openings. It is designed for use with the STIRLING ULTRACOLD ULT25NEU model.
What are the specifications of the STIRLING ULTRACOLD SUPCM-70-Kit?
The kit includes three ABS plastic bricks, each 15 inches long and 9 inches wide. It is compatible with the STIRLING ULTRACOLD ULT25NEU model. The manufacturer part number is SUPCM-70-Kit. The material is ABS plastic, and the product type is Phase Change Material Kit.
Where to buy the STIRLING ULTRACOLD SUPCM-70-Kit worldwide?
3G Electric supplies the STIRLING ULTRACOLD SUPCM-70-Kit to customers worldwide. We handle full logistics, customs clearance, and delivery to your location. Contact us for a quote and lead time. We source genuine industrial equipment across 14 departments, including cold storage accessories.
How to install the STIRLING ULTRACOLD phase change bricks?
Place the bricks inside the cold storage unit according to the manufacturer's guidelines for the ULT25NEU model. Ensure they are positioned for optimal air circulation. The bricks are reusable; freeze them solid before each use. Always follow STIRLING ULTRACOLD's instructions for safe handling and maximum thermal performance.
Used in
Common applications for STIRLING ULTRACOLDSTIRLING ULTRACOLD Products
3G Electric supplies STIRLING ULTRACOLD cold storage alarms, power cords & accessories. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
