FBR GPL
FBR GAS CE D2"-S is a single-stage gas burner for industrial heating applications, delivering up to 850 kW thermal power with a 250 mm nozzle. Operating at 61-62 dBA noise level and IP 40 protection, it suits…
SKU 3G-FBR-00628
Also listed as: 05703931 · 057039 31 · 057039-31
Local availability & support — Singapore
- Local office
- 20 Woodlands Link #09-05, Singapore 738733
- Phone
- +65 8878 8355
- Delivery
- Same-day or next-business-day delivery within Singapore for in-stock items; 7–14 days for factory-order parts from Europe.
- Payment
- Invoicing in SGD. PayNow, bank transfer, and corporate PO accepted.
- Ships to
- Singapore
Need installation or engineering help?
Ask a question
Product Description
FBR GAS CE D2"-S is a single-stage gas burner for industrial heating applications, delivering up to 850 kW thermal power with a 250 mm nozzle. Operating at 61-62 dBA noise level and IP 40 protection, it suits mid-range commercial and industrial combustion systems.
Frequently Asked Questions
What is the FBR GAS CE D2"-S gas burner used for?
The FBR GAS CE D2"-S is a single-stage gas burner designed for industrial heating applications, including commercial kitchens and mid-range combustion systems. It delivers up to 850 kW thermal power and is suitable for natural gas or LPG installations requiring reliable, efficient operation.
What are the specifications of the FBR GAS CE D2"-S?
The FBR GAS CE D2"-S is a single-stage gas burner with a 250 mm nozzle, 75 W fan motor, and 130 W nominal electric power. It operates at 61-62 dBA noise level, IP 40 protection, and 3-phase 50 Hz electrical supply. Maximum thermal power is 850 kW, with gas consumption of 2.5/4.1-9.4 Nm³/h.
Where to buy the FBR GAS CE D2"-S in Singapore?
3G Electric sources and delivers the FBR GAS CE D2"-S gas burner to Singapore, handling logistics, customs clearance, and local technical support. Contact our team for pricing and lead time on this industrial burner for your combustion system.
How to install the FBR GAS CE D2"-S gas burner?
Install the FBR GAS CE D2"-S by mounting the supplied flange and gasket to the boiler or furnace, ensuring proper gas-tight seals. Connect the 3-phase 50 Hz electrical supply and gas line at nominal pressure (e.g., 20 mbar for G20). Commission per the FBR manual, verifying safety time under 3 seconds.
Used in
Common applications for FBRFBR Products
3G Electric supplies FBR burners & combustion. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
